Generally, the Dimension Icon SPM requires very little maintenance. A simple schedule of cleaning and calibration checks is usually sufficient.

Every 3 months:

  1. Wipe down the major components of the instrument.
  2. Clean the SPM stage.
  3. Check the air table for proper level and isolation.
  4. Check the piezo Calibration.

 